Can process CAD drawing materials) can open steel network late.
1.1-24 layer model production, can be delivered as soon as 12 hours;
2.1- 24-layer medium and small batch production, the fastest can be delivered 24 hours;
3. Can copy board, board, drawing board, BOM, schematic diagram and so on;
4. Quick delivery, quality assurance and reasonable price.
Shenzhen aoke technology co. LTD.